Material obligation validation report

being taken and are found in the NAVSUP P-485.

identifier in the AC-series is used. Submission of a

Cancellations should be called to the attention of the

cancellation request does not guarantee cancellation of

supply officer so that, if the material is still required,

the requisition. If the supply activity has already

new procurement action may be taken. The other status

released or shipped the material, the requisition cannot

codes, representing passing action, backorders,

be canceled. For this reason, you should not consider a

shipping status, and so forth, should be reviewed, and

requisition canceled until confirmation is received

appropriate action taken, as required.

from the supply activity.

REQUISITION FOLLOW-UP

REQUISITION MODIFIER

When material or status has not been received by

A requisition modifier document may be initiated

the standard delivery date or the required delivery date

by the requisitioner, supplementary addressee, or

(if shown in CC 62-64 of the DD Form 1348), you may

monitoring office, to modify the priority designator,

submit a follow-up to determine status. The standard

delivery date is computed by adding the authorized

required delivery date, media and status code, and/or

UMMIPS delivery time to the Julian date of your

distribution code of a previously submitted requisition

requisition. The follow-up may be submitted by

Force/activity designator (F/AD) is upgraded or

In either case, document identifier AF1 and the

downgraded

routing identifier for the last known holder of the

Urgency of the requirement increases (except for

requisition are assigned. The balance of the follow-up

is identical to the original unless part of the material

CASREP) or decreases due to unplanned or

has already been received. If status or material has not

unforeseen conditions.

been received from NOZ within the time allotted, the

The project code may also be modified if the

follow-up would be for 2 EA and not 6 EA as appearing

on the original requisition. The original follow-up is

outstanding requisition is held by a Navy activity.

sent to the activity indicated by the routing identifier

When material on order is required to satisfy a

and the copy of a copy of the message filed with the

CASREP, the outstanding requisition will not be

outstanding requisition. If the follow-up message

modified. A NORS requisition must be submitted for

includes multiple document numbers, the hardback

the CASREP requirement.

copies of the related requisitions in the MOF is

annotated to indicate the DTG of the message.

MATERIAL OBLIGATION VALIDATION

The supply activity then furnishes the current

status of your requisition.

P e r i o d i c a l l y, s u p p l y a c t iv i t i e s r ev i ew a l l

When taking follow-up action on a requisition for

requisitions held on backorder and for those considered

urgently needed material for which the standard

overage; they prepare backorder reconciliation for each

delivery date or required delivery date is past with no

status received, document identifier AT-may be used

requisitioner. When you receive an MOV request, the

instead of AF1. This tells the supply activity that if they

cards or listing should be checked against your records

have no record of the original requisition, to process

and a report made in accordance with the instructions

the follow-up as a requisition. This could preclude the

included with the request. The reconciliation serves

need for another requisition if response to an AF1

several purposes of which the following are of interest to

follow-up should be "no record of your requisition."

However, it may also result in duplicate shipment and

Current status of outstanding requisitions

Cancellation of old requisitions for material no

REQUISITION CANCELLATION

longer needed by your ship

When material is no longer required, a

Correction of files maintained by the supply

cancellation request should be sent to the last known

holder of the requisition. It is prepared m the same

activity requesting the reconciliation